27.11.09
DONE
25.11.09
Pigpens Frame
Workin on getting the 4 cam death machine on the road, just a fewmore welds to go and she will be ready. Should be bullet proof as all hell, the bottom tubes were worrying me a bit so i took some 1.5 od tubing and made a set of sleeves. not really that pretty but if they ever break i'll be amazed. kinda looks like it has a tumor or popeye arms.
19.11.09
new parts
all kinds of old shift knob
stainless, copper, aluminum, copper, stainless. Yeah thats right i made my own copper exhaust gaskets. It only took me about 5 hours of layout, cutting, shaping, more shaping, buffing, reshaping and more buffing to come. stainless exhaust tips to follow. Oh and the aluminum peice in the middle mounts the two pipes to the frame. yeah the copper gaskets and aluminum parts are one piece holding the pipes together. if you steal this idea i will know and i will smash you bike apart with a hammer. Naw im just fuckin with you, i bet someone else already did this before me. I just made it look fuckin sweet.
16.11.09
15.11.09
goings on
hell i can never get those to post in the right order. but harlan drank some acetone then felt like crap and died oh well. So his brother painter justin decided that its about time for him to lay down some clear on his motor. Then i cleared out the motor building room that had turned into a storage closet over the last couple of week and got his top end backtogether. 97" big bore, lightly worked heads, 04+ sporty boxes, cam TBA.
10.11.09
9.11.09
Subscribe to:
Posts (Atom)